Prior to the establishment of ALB Consultants, the Principal accumulated the following experience:
2003 to 2008 General Manager/Director of IMEG Ltd responsible for:
1980 to 1981 Chief Hydraulic Engineer (Pipelines) at Foster Wheeler responsible for the conceptual design of 8 multiproduct pipelines, one LPG pipeline and one crude oil line, totalling in excess of 2000km in Saudi Arabia.
2003 to 2008 General Manager/Director of IMEG Ltd responsible for:
- Proof of Concept for three 35MW VSD electric driven compressors for Transco, UK to be installed at St Fergus and Kirriemuir.
- Detailed design of the Accra Plains Depot, Ghana expansion for Zakhem Construction Ghana, which consisted of four 20,000m3 tanks, four 10,000m3 tanks and two truck loading stations.
- 85 bar upgrade of two Transco compressor stations
- Feasibility studies of 17 different Transco compressor stations
- Hydraulic design of several Russian pipelines
- Detail design and commissioning of the Escravos Lagos Pipeline Contract A which included four compressor stations, 100km swamp pipeline and a slug catcher
1980 to 1981 Chief Hydraulic Engineer (Pipelines) at Foster Wheeler responsible for the conceptual design of 8 multiproduct pipelines, one LPG pipeline and one crude oil line, totalling in excess of 2000km in Saudi Arabia.